DIGGIN' DOWNTOWN UPDATE - 5/30
Date: May 30, 2025
Recent Weeks:
Subdrain Installation (Washington St)
Concrete Paving Operations (Washington St)
Next Week:
Phase 1A Washington Street Monday 6/2 to Friday 6/6 – Contractor to continue subdrain installation and concrete paving along Washington Street.
Phase 1B Main Street Monday 6/2 to Friday 6/6– Contractor to install storm sewer utility.
Looking Ahead:
Washington Street will remain closed as paving operations continue throughout the following weeks. Main Street will remain closed for utility installation.