DIGGIN' DOWNTOWN UPDATE - 6/6

Last Updated 6/6/2025Posted in DIGGIN' DOWNTOWN

Date: June 6, 2025

Recent Weeks:

Subdrain Installation (Washington St)

Concrete Paving Operations (Washington St)

Storm Sewer installation (Main Street)

Next Week:

Phase 1A Washington Street

Monday 6/9 to Friday 6/13 – Contractor to continue PCC (Plain Cement Concrete) street and sidewalk installation along Washington Street.

Phase 1B Main Street

Monday 6/9 to Friday 6/13– Contractor to continue storm sewer utility installation.

Looking Ahead:

Washington Street will remain closed as paving operations continue throughout the following weeks. Main Street will remain closed for utility installation.


Follow Downtown Osceola Streetscape Project on Facebook to follow along with the progress.

DIGGIN' DOWNTOWN UPDATE - 6/6Date: June 6, 2025 Recent Weeks: Subdrain Installation (Washington St) Concrete Paving Operations (Washington St) Storm Sewer installati...
DIGGIN' DOWNTOWN UPDATE - 5/30Date: May 30, 2025 Recent Weeks: Subdrain Installation (Washington St) Concrete Paving Operations (Washington St) Next Week: Phase 1A Wa...
DIGGIN' DOWNTOWN UPDATE - 5/23Date: May 23, 2025 Recent Weeks: Subdrain Installation (Washington St) Concrete Paving Operations (Washington St) Pavement Removals (Mai...
Welcome to Osceola, Droppett! | Ribbon Cutting + Coffee... On May 15,we had the pleasure of officially welcoming Droppett to Osceola with a celebratory Ribbon Cutting and Coffee Connections event...