Request for Proposal: Public Art Mural Project at 148 W Jefferson Street

Last Updated 12/16/2021

Overview:

Seeking bids from artist(s) to create and install a mural on a two-story brick building in downtown Osceola, Iowa. The empty lot between Clarke County Public Health and Kerr Family Dental will be turned into a pocket park themed “Salute to Volunteers” to honor volunteerism. The area will contain a large mural, ADA compliant seating, sunshade, and plants. It will be an easy- to- maintain, gathering space and visitor attraction.

Goals:

- Select a dedicated and qualified artist or artist team that demonstrate artistic excellence while completing this project on time and within budget.

- Create a piece of public art for an outdoor environment that reflects volunteerism.





Location

148 W Jefferson Street, Osceola, IA (Kerr Family Dental)

Artist Requirements and Desired Skills

- Artist will be expected to both create the design and complete the painting/installation.

- Willingness to work with community representatives on the design.

- The artist will do up to two meetings with the Mural Project representatives to discuss and revise the design (if needed) before final approval is given.

- The project budget is not to exceed $4,000 for an artist or team of collaborative artists.  The budget should include the artist(s) fee, supplies, travel related expenses, and other associated costs.

- A grant for 5 gallons of free Diamond Vogel paint has been awarded for this project if the artist wishes to use it.

Application Requirements

- Supporting materials, including images and reviews of previously completed works.

- Project Budget

- Statement of qualifications for completing this project (previous experience with public art or large-scale artwork such as this, no more than 1-3 paragraphs)

- Narrative and design illustrating the concepts is required for each submission. Include supplemental   information such as medium, timeline for completion and approximate dimensions of proposed   mural.

- The submission deadline is August 1, 2021.

- Submit via email at [email protected] or mail/drop of at the Osceola Chamber Main Street office.

115 E Washington Street

PO Box 425

Osceola, IA 50213

Mural Application

DIGGIN DOWNTOWN UPDATE - 4/24Date: April 24, 2026 Recent Weeks: Sanitary Sewer/Water Main Installation (Fillmore St) Paving Preparation (Fillmore St) Next Week: Phas...
DIGGIN DOWNTOWN UPDATE - 4/17Date: April 17, 2026 Recent Weeks: Storm Sewer/Water Main Installation (Fillmore St) Sidewalk Installation (Fillmore St) Next Week: Phas...
DIGGIN DOWNTOWN UPDATE - 4/3Date: April 3, 2026 Recent Weeks: Storm Sewer Installation (Fillmore St) Pavement Removal (Fillmore St) Permeable Paver Installation (Je...
DIGGIN DOWNTOWN UPDATE - 3/30Date: March 27, 2026 Recent Weeks: Storm Sewer Installation (Fillmore St) Curb and Gutter Installation (Jefferson St) Permeable Paver In...