DIGGIN' DOWNTOWN UPDATE - 7/18

Last Updated 7/21/2025Posted in DIGGIN' DOWNTOWN

Date: July 18, 2025

Recent Weeks:

(Washington Street/Main Street)

Storm Sewer installation

Permeable Paver Installation (Washington St)

Concrete Paving Operations (Washington St)


Next Week:

Phase 1A Washington Street

Monday 7/21 to Friday 7/25 – Contractor to continue permeable paver and subdrain installation along Washington Street.

Phase 1B Main Street

Monday 7/21 to Friday 7/25 – Sanitary Sewer installation will begin along Washington Street east of Main Street. Contractor will move to water main installation at the intersection of Washington Street and Main Street toward the end of the week.

Looking Ahead:

Washington Street will remain closed as paving and permeable paver installations continue throughout the following weeks. Main Street and East Washington Street will remain closed for utility installation.



DIGGIN' DOWNTOWN UPDATE - 7/18Date: July 18, 2025 Recent Weeks: (Washington Street/Main Street) Storm Sewer installation Permeable Paver Installation (Washington St) ...
DIGGIN' DOWNTOWN UPDATE - 7/11Date: July 11, 2025 Recent Weeks: Roadway Extended East to Intersection (Washington St) Permeable Paver Installation (Washington St) Wes...
DIGGIN' DOWNTOWN UPDATE - 7/3Recent Weeks: Concrete Paving Operations (Washington St) Permeable Paver Installation (Washington St) Storm Sewer installation (Washingt...
DIGGIN' DOWNTOWN UPDATE - 6/27Date: June 27, 2025 Recent Weeks: Concrete Paving Operations (Washington St) Permeable Paver Installation (Washington St) Storm Sewer in...